Trung Quan Hotel Project in Hai Phong

Trung Quan Hotel Project in Hai Phong is a long-span floor project and the owner was wondering if using traditional solid concrete slabs may cause heavy trains on the foundation. However, with experience of supplying foam voided system for the construction of countless hotels and resorts, VRO easily helped the Owner to solve the problems of heavy slabs and big loading beams. Foam voided system can lighten the weight of slabs and, thus, allow more floors on the previously designed foundation.

Thi công sàn xốp cho khách sạn Trung Quân - Hải Phòng

Trung Quan Hotel Project in Hai Phong

Advantages of EPS foam core voided slab VRO (S-VRO)

– Optimizing architectural space
– Reducing the floor-to-floor heights because flat-plate floors don’t have loading beam, thus saving materials and energy
– Increase the number of floors at the same designed height of the building, then increase the operation efficiency
– Longer floor span (can reach 20m)
– Simple formwork, fast construction and clean jobsite
– Reduce the volume of works at jobsite
– Better bearing capacity
– Using eco-friendly unburnt materials
– Reduce the finishing volume
– No need to install false ceiling but still has very good sound and heat insulation
– Production following a standard process with strict quality control
– The input materials have clear origins with due C/O
– Optimal architectural space

Thi công sàn xốp cho khách sạn Trung Quân - Hải Phòng

MORE VIDEO OF LARGE SPAN FLAT SLAB S-VRO

CONTACT US FOR FREE CONSULTANCY AND EXPERIENCING OUR LATEST SLAB TECHNOLOGY

VRO CONSTRUCTION JOINT STOCK COMPANY
Address: Lot 40, Block 7, General Department 5 Urban Area, Ministry of Public Security – Tan Trieu – Thanh Tri – Ha Noi
Youtube: https://www.youtube.com/@VROVIETNAM
Facebook: https://www.facebook.com/vrogroup
Email: sale@vro.vn
Contact: 0866.04.5577

Leave a Reply

Your email address will not be published. Required fields are marked *