Everland Restaurant Project is located in Quang Binh. The project features big hall with quite long spans. Therefore, voided slab is the only solution. The Owner chose VRO’s foam voided system to construct the slab. The foam voids help to eliminate the non-working concrete in the slab structure, contributing to longer spans, saving construction cost and, at the same time, provides a wide variety of unique advantages.

Advantages of EPS foam core voided slab VRO (S-VRO)
– Optimizing architectural space
– Reducing the floor-to-floor heights because flat-plate floors don’t have loading beam, thus saving materials and energy
– Increase the number of floors at the same designed height of the building, then increase the operation efficiency
– Longer floor span (can reach 20m)
– Simple formwork, fast construction and clean jobsite
– Reduce the volume of works at jobsite
– Better bearing capacity
– Using eco-friendly unburnt materials
– Reduce the finishing volume
– No need to install false ceiling but still has very good sound and heat insulation
– Production following a standard process with strict quality control
– The input materials have clear origins with due C/O
– Optimal architectural space
Everland Restaurant Project in Quang Binh


MORE VIDEO OF LARGE SPAN FLAT SLAB S-VRO
CONTACT US FOR FREE CONSULTANCY AND EXPERIENCING OUR LATEST SLAB TECHNOLOGY
VRO CONSTRUCTION JOINT STOCK COMPANY Address: Lot 40, Block 7, General Department 5 Urban Area, Ministry of Public Security – Tan Trieu – Thanh Tri – Ha Noi Youtube: https://www.youtube.com/@VROVIETNAM Facebook: https://www.facebook.com/vrogroup Email: sale@vro.vn Contact: 0866.04.5577
