Nga Son Hotel Construction Project in Thanh Hoa

Nga Son Hotel Construction Project in Thanh Hoa province is a typical hotel project designed with long-span floors. VRO’s system with foam voids, therefore, is the best choice to construct such flat-plate floors. Moreover, VRO’s slab technology has superior advantages over other voided systems on the market. Let’s check out as following.

Location: Thanh Hoa Province

Thi công và hoàn thiện công trình khách sạn Nga Sơn tại Thanh Hóa

Advantages of EPS foam core voided slab VRO (S-VRO)

– Optimizing architectural space
– Reducing the floor-to-floor heights because flat-plate floors don’t have loading beam, thus saving materials and energy
– Increase the number of floors at the same designed height of the building, then increase the operation efficiency
– Longer floor span (can reach 20m)
– Simple formwork, fast construction and clean jobsite
– Reduce the volume of works at jobsite
– Better bearing capacity
– Using eco-friendly unburnt materials
– Reduce the finishing volume
– No need to install false ceiling but still has very good sound and heat insulation
– Production following a standard process with strict quality control
– The input materials have clear origins with due C/O
– Optimal architectural space

Advantages of EPS foam hollow core smart brick VRO (G-VRO):

– Fast construction, clean site, directly painting without waiting time
<- Lightweight, about 35-50% less than the weight of conventional brick wall
– Sound & heat insulation, waterproofing
– Durability, high hardness because the brick is made from high grade concrete (grade > #200) with reinforcement, so it is stiff enough to hang heavy stuff.
– The finished walls have different thickness options: 100-125-150-175-200-250mm.
– The construction cost is equivalent to that of conventional brick wall 110cm and is about 10 to 15% more economical than the conventional brick wall 220cm.
– The wall is built with mortar added with plastizing admixture to form a whole block, so there is no splitting and node cracking as seen in other kinds of block wall.
– The construction process is almost similar to building large burnt bricks, so ordinary workers can also build immediately
– Production of bricks is arranged at the site to reduce transportation costs, greatly reducing product costs. Because this is a kind of unburnt brick so it’s very environmentally friendly.
– Brick can be used as a load-bearing wall to replace wall column when building a house up to 3-4 floors. In that case, steel is added the hollow bricks to create a pillar or bracing of the floor.
– It is possible to build large walls up to 10m high for projects such as factories and halls

More images of actual construction at Nga Son jobsite

Thi công và hoàn thiện công trình khách sạn Nga Sơn tại Thanh Hóa

Công trình KS Nga Sơn - Thanh Hoá.

Công trình KS Nga Sơn - Thanh Hoá.

Công trình KS Nga Sơn - Thanh Hoá.

Công trình KS Nga Sơn - Thanh Hoá.

Công trình KS Nga Sơn - Thanh Hoá.

Công trình KS Nga Sơn - Thanh Hoá.

ACTUAL CONSTRUCTION OF VOIDED SLAB S-VRO:

CONTACT US FOR FREE CONSULTANCY AND EXPERIENCING OUR LATEST SLAB TECHNOLOGY

VRO CONSTRUCTION JOINT STOCK COMPANY
Address: Lot 40, Block 7, General Department 5 Urban Area, Ministry of Public Security – Tan Trieu – Thanh Tri – Ha Noi
Youtube: https://www.youtube.com/@VROVIETNAM
Facebook: https://www.facebook.com/vrogroup
Email: sale@vro.vn
Contact: 0866.04.5577

Leave a Reply

Your email address will not be published. Required fields are marked *