Pearl River 2 Hotel Project is a 5-star hotel in Hai Phong. VRO was chosen to supply foam voided slabs for projects because the Owner consider the economical result this foam voided system can bring. The foam voids help to eliminate the non-working concrete in the slab structure, contributing to longer spans, saving construction cost and, at the same time, provides a wide variety of unique advantages. 

Pearl River 2 Hotel Project In Hai Phong

Pearl River 2 Hotel Project In Hai Phong

Advantages of EPS foam voided slab VRO (S-VRO)

– Optimizing architectural space

– Reducing the floor-to-floor heights for voided slab doesn’t have loading beams, saving materials and energy

– Increase the number of floors at the same designed height of the building, then increase the operation efficiency

– Long-span floor (can reach 20m)

– Simple formwork, fast construction and clean jobsite

– Reduce the volume of works at jobsite

– Better load bearing capacity

– Using eco-friendly unburnt materials

– Reduce the finishing volume

– No need to install false ceiling but still has very good sound and heat insulation

– Production following a standard process with strict quality control

– The input materials have a clear origin with certification of origin

– Optimal architectural space

Pearl River 2 Hotel Project In Hai Phong

Pearl River 2 Hotel Project In Hai Phong

MORE VIDEO OF VOIDED SLAB S-VRO

CONTACT US FOR FREE CONSULTANCY AND EXPERIENCING OUR LATEST SLAB TECHNOLOGY

VRO CONSTRUCTION JOINT STOCK COMPANY 
Address: 461 Truong Dinh, Hoang Mai Dist., Hanoi 
Youtubehttps://www.youtube.com/watch?v=na0JiXWzZt4 
Facebook: https://www.facebook.com/vrogroup 
Online storehttps://vatgia.com/xaydungVRO 
Email: kinhdoanh@vro.vn 
Contact: 0866.04.5577