Trung Quan Hotel Project in Hai Phong is a long-span floor project and the owner was wondering if using traditional solid concrete slabs may cause heavy trains on the foundation. However, with experience of supplying foam voided system for the construction of countless hotels and resorts, VRO easily helped the Owner to solve the problems of heavy slabs and big loading beams. Foam voided system can lighten the weight of slabs and, thus, allow more floors on the previously designed foundation.
Advantages of EPS foam voided slab VRO (S-VRO)– Optimizing architectural space
– Reducing the floor-to-floor heights for voided slab doesn’t have loading beams, saving materials and energy
– Increase the number of floors at the same designed height of the building, then increase the operation efficiency
– Long-span floor (can reach 20m)
– Simple formwork, fast construction and clean jobsite
– Reduce the volume of works at jobsite
– Better load bearing capacity
– Using eco-friendly unburnt materials
– Reduce the finishing volume
– No need to install false ceiling but still has very good sound and heat insulation
– Production following a standard process with strict quality control
– The input materials have a clear origin with certification of origin
– Optimal architectural space
MORE VIDEO OF VOIDED SLAB S-VROCONTACT US FOR FREE CONSULTANCY AND EXPERIENCING OUR LATEST SLAB TECHNOLOGY
VRO CONSTRUCTION JOINT STOCK COMPANY
Address: 461 Truong Dinh, Hoang Mai Dist., Hanoi
Youtube: https://www.youtube.com/watch?v=na0JiXWzZt4
Facebook: https://www.facebook.com/vrogroup
Online store: https://vatgia.com/xaydungVRO
Email: kinhdoanh@vro.vn
Contact: 0866.04.5577